{"page":{"id":78,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://mirelgems.com/cancel-change-order/","body_html":"<!--email_off-->\n<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-06\">October 6, 2026</time></p>\n<p>The most common message we receive in the first hour after an order is some version of &#8220;I just noticed a typo in the engraving.&#8221; The second most common is &#8220;Can I change the ring size?&#8221; Both are easy to fix if you tell us quickly, because engraving is the step that makes a piece permanent. This page explains the 24-hour change window, what can be changed, what happens once a piece has been engraved, and how refunds work for cancelled orders.</p>\n<section class=\"policy-summary\">\n<h2>Changes and cancellations at a glance</h2>\n<ul>\n<li><strong>Free changes or cancellation:</strong> within 24 hours of placing your order, as long as it has not shipped.</li>\n<li><strong>What can change:</strong> engraving text, font, size, length, metal, leather colour, quantity, items and shipping address.</li>\n<li><strong>After 24 hours:</strong> we still try to help, and an engraved piece can always be returned or exchanged within 60 days of delivery.</li>\n<li><strong>Refunds for cancelled orders:</strong> the full amount, issued within 7 business days of our confirmation.</li>\n</ul>\n</section>\n<h2>1. The 24-hour window</h2>\n<p>For 24 hours after you place an order you can cancel it or change any detail, free of charge, as long as the parcel has not been handed to the carrier. We hold engraving until this window has mostly passed for exactly this reason. Contact us as early as you can; a message sent ten minutes after ordering is always in time, and a message sent at hour 23 almost always is.</p>\n<p>The window is counted from the time on your order confirmation email, in calendar hours, including weekends. An order placed on Friday at 9 p.m. can be changed until Saturday at 9 p.m., even though we do not engrave on weekends.</p>\n<h2>2. How to request a change or cancellation</h2>\n<ol>\n<li>Email <a href=\"mailto:support@mirelgems.com\">support@mirelgems.com</a> or <a href=\"/submit-ticket/\">submit a ticket</a>. Put &#8220;Change&#8221; or &#8220;Cancel&#8221; and your order number in the subject line so we see it first.</li>\n<li>Tell us exactly what should change. For engraving text, type the full new text, not only the correction, so there is no doubt about spacing or punctuation.</li>\n<li>Use the email address you ordered with, so we can confirm the request comes from you.</li>\n<li>We confirm in writing within 1 business day. The change is final once you receive our confirmation; if you have not heard from us, the change has not been made yet.</li>\n</ol>\n<p>Requests made inside the 24 hours are honoured even if our written confirmation arrives after the window closes, because the time that counts is when your message reached us.</p>\n<h2>3. What can be changed</h2>\n<table class=\"policy-table\">\n<caption>Changes we can make before an order ships</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Within 24 hours</th>\n<th scope=\"col\">After 24 hours, not yet engraved</th>\n<th scope=\"col\">After engraving</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Engraving text or font</td>\n<td>Free</td>\n<td>Free if we can still catch it</td>\n<td>Return or exchange after delivery</td>\n</tr>\n<tr>\n<td>Ring size or chain length</td>\n<td>Free</td>\n<td>Free if we can still catch it</td>\n<td>Return or exchange after delivery</td>\n</tr>\n<tr>\n<td>Metal or leather colour</td>\n<td>Free</td>\n<td>Free if we can still catch it</td>\n<td>Return or exchange after delivery</td>\n</tr>\n<tr>\n<td>Add or remove items</td>\n<td>Free</td>\n<td>Usually possible</td>\n<td>Removed items can be returned</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Free</td>\n<td>Free until handed to the carrier</td>\n<td>Carrier redirect requested</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>Full refund</td>\n<td>Full refund if not yet engraved</td>\n<td>Return after delivery for a full refund</td>\n</tr>\n</tbody>\n</table>\n<p>If a change affects the price, for example switching from stainless steel to sterling silver, we tell you the difference first and only charge it after you agree. If the new total is lower, we refund the difference within 7 business days.</p>\n<h2>4. Typos and engraving text</h2>\n<p>We read every engraving before it is cut, and if something looks like a slip, such as a date of 31.06 or a name typed twice, we email you and wait for your answer. We cannot know whether an unusual spelling is intentional, so we never change your text without asking. Common things to check before you pay:</p>\n<ul>\n<li>Capital letters: engraving reproduces exactly what you type, including all-capitals or all-lowercase.</li>\n<li>Date format: 06.14.2019 and 14.06.2019 are different dates in the US and in Australia or New Zealand. Write the month as a word if in doubt.</li>\n<li>Symbols: hearts, ampersands and dots can be engraved where the product page lists them; emoji cannot.</li>\n<li>Character limit: each product page shows how many characters fit. Spaces count.</li>\n</ul>\n<h2>5. After the 24 hours</h2>\n<p>Once the window has passed, your piece may already be engraved. We still check every late request: if the piece has not been engraved yet, we make the change free of charge. If it has, the piece cannot be altered, but you are covered by our 60-day returns: when it arrives, you can exchange it for a piece with the corrected text, size or colour, and we pay the return postage. See <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a>.</p>\n<h2>6. If your order has already shipped</h2>\n<p>Once the parcel is with the carrier, we can no longer cancel or change it. Accept the delivery and start a return or exchange within 60 days. If only the address needs correcting, we ask the carrier to redirect the parcel; the carrier decides whether that is possible. If the parcel comes back to us undelivered, we reship it free to the corrected address.</p>\n<h2>7. Refunds for cancelled orders</h2>\n<p>When we confirm a cancellation, we refund everything you paid to your original payment method within 7 business days (that is 7 days counted Monday to Friday, excluding US public holidays). Your bank may take a little longer to show it. The <a href=\"/refund-policy/\">Refund Policy</a> explains the timing in detail.</p>\n<h2>8. Cancellations by Mirel Gems</h2>\n<p>Very occasionally we have to cancel an order ourselves: the engraving text cannot fit the piece even after we suggest alternatives, a metal or leather colour becomes unavailable, a price was shown incorrectly, a payment cannot be verified, or the address is outside our delivery area. We email you straight away, explain why, suggest an alternative where there is one, and refund the full amount if you do not want the alternative.</p>\n<h2>9. Changes for gift and group orders</h2>\n<p>Wedding-party sets, couple&#8217;s pairs and other group orders often change as plans change: a bridesmaid joins, a groomsman&#8217;s name is spelled differently, or the couple decide on gold instead of silver. Each piece in a group order is handled separately, so you can change one name without disturbing the others. Within 24 hours every change is free; after that, the rules in section 5 apply to each piece individually.</p>\n<p>If you are ordering for a group and expect changes, it can help to wait until the list is final before ordering. If the date does not allow that, order now and tell us in the order note that changes may follow; we will check with you before engraving.</p>\n<h2>10. Memorial orders</h2>\n<p>For memorial pieces we always send a short confirmation of the names and dates before engraving, even when nothing looks unusual, because these details matter most and are the hardest to check when you are grieving. You can reply with corrections at any time before the piece is cut. If you need more time, simply tell us and we will hold the order.</p>\n<h2>11. Three real-world timelines</h2>\n<p>These invented examples show how the window works with real clocks.</p>\n<h3>A typo noticed after ten minutes</h3>\n<p>An order for a bar necklace reading &#8220;Elana · 14.06.2019&#8221; is placed on Tuesday at 8:05 p.m. At 8:15 p.m. the buyer realises the name should be &#8220;Elena&#8221;. She replies to the order confirmation email with the subject &#8220;Change, order 1042&#8221; and the full corrected text. We confirm on Wednesday morning, the piece is engraved with the corrected name, and it ships within the normal 1–3 business days. Nothing is charged and nothing is delayed.</p>\n<h3>A ring size question after a day and a half</h3>\n<p>An anniversary ring is ordered on Monday at noon in US 7. On Wednesday morning the buyer learns from a friend that the wearer takes US 8. The 24 hours have passed, so we check the order: if the ring has not been engraved yet, we change the size free of charge. If it has already been engraved, the ring ships as ordered and the buyer can exchange it for US 8 after delivery, with the return postage paid by us and the same engraving on the new ring.</p>\n<h3>An address change after shipping</h3>\n<p>A graduation passport holder ships on Thursday to a college dorm. On Friday the buyer remembers the student has moved home for the summer. We cannot change the parcel ourselves once it has left, so we ask the carrier for a redirect on the buyer&#8217;s behalf. If the carrier cannot redirect it and the parcel comes back to us, we send it again to the home address at no cost.</p>\n<h2>12. Why we do not offer longer free-change windows</h2>\n<p>We could hold every order for several days before engraving, but that would push every delivery later, including the many orders that never need a change. A 24-hour window is a balance: it gives you a full day to re-read your engraving and check sizes while keeping our processing time at 1–3 business days. Because any engraved piece can still be exchanged within 60 days of delivery with return postage paid by us, missing the window never leaves you stuck with something that is wrong; it only means the fix happens after delivery instead of before.</p>\n<h2>13. Payment holds and duplicate orders</h2>\n<p>Sometimes a checkout seems to fail and the order is placed again, leaving two identical orders. If you notice a duplicate, tell us within 24 hours and we cancel the extra order and refund it in full. If we notice it first, for example two orders with the same engraving minutes apart, we email you to ask which one to keep before engraving either. You are never charged twice for the same piece because of a checkout hiccup.</p>\n<p>Your bank may show a temporary authorization for a cancelled order for a few days after we release it. That is a hold, not a charge, and it disappears on its own; if it has not cleared within 10 business days, send us the details and we will check it with the payment provider.</p>\n<h2>14. Changing your mind about a gift message or packaging</h2>\n<p>The gift card message, the choice to leave prices off the packing slip, and any note about delivering to a neighbour can all be changed at any point before the parcel ships, not only within the 24 hours, because none of them involve engraving. Send the new wording by email with your order number and we update the order before packing.</p>\n<h2>15. Contact us</h2>\n<p>Email <a href=\"mailto:support@mirelgems.com\">support@mirelgems.com</a> with your order number and the change you need. We reply within 1 business day. You can also check your order on <a href=\"/order-tracking/\">Order Tracking</a> or read <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> for delivery times after a change.</p>\n\n<!--/email_off-->","visible_characters":10121,"meta_description":"Change your engraving, size, metal or address, or cancel, free within 24 hours of ordering. See what happens after engraving and how cancellations are refunded.","parent":null,"published_at":"2026-10-06T04:35:33+00:00","updated_at":"2026-10-06T04:35:33+00:00"}}